Indonesia: Small Power Distributed Generation Using Renewable Energy
The policy has set tariffs to be paid to generators at 60% of the utility’s production cost if the project is connected to the low voltage grid, and 80% if connected to the medium voltage grid.
Date Implemented: 2002
Status: In Force; Voluntary
References: http://gsr.ren21.net/index.php?title=Indonesia