SD-PAMs: Solar

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Resolution no 112

This resolution establishes the requirements for obtaining the registration or authorization for the implementation, expansion or refitting of thermoelectric, wind or photovoltaic generating stations and of other alternative energy sources destined for selling energy under the form of independent production, exclusive use or execution of a public service. Stations with a generating capacity of less than 5MW only require registration; authorization is required for stations with greater than 5MW generating capacity

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: Electrical Sector Act 10.438/2002

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: National Programme for Energy Development of States and Municipalities (PRODEEM)

The Program of Energy Development of States and Cities- PRODEEM, is an initiative that aims to take electric energy to agricultural communities using renewable resources. The government procures the necessary equipment and distributes it to the states and municipalities identified/chosen for projects. The projects focus on community development (schools, community centers, health facilities) rather than household electrification.

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Sol Brasil

Sol Brasil is a program of the Ministry of Science and Technology designed to increase the use of solar water heating. Its initiatives and activities include a marketing scheme, qualification/certification standards for solar water heater installers, and R&D support and incentives to promote innovation with SWH companies.


Status: In Force

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Projeto Ribeirinhas

The project aims to study the viability of providing energy to small, rural communities particularly in the Amazon region, using microsystems that provide renewable energy in a sustainable manner.


Status: In Force; Government Initiative

References: http://www.eletrobras.gov.br/EM_Programas_Ribeirinhas/default.asp

Brazil: Selective Incentive Programme for Solar Water heating in Sao Paulo Municipality

São Paulo, solar water heating mandatory in large residences after 2010 [this is not mentioned in the Legislative Proposal 276/06].


Date Implemented: 2006

Status: Mandatory by 2010

References: Legislative Proposal (Projeto de Lei) 276/2006, 28 April 2006

Brazil: Selective Incentive Programme for Solar Water heating in Sao Paulo Municipality

São Paulo, solar water heating mandatory in large residences after 2010 [this is not mentioned in the Legislative Proposal 276/06].


Date Implemented: 2006

Status: Mandatory by 2010

References: Legislative Proposal (Projeto de Lei) 276/2006, 28 April 2006

Brazil: Selective Incentive Programme for Solar Water heating in Sao Paulo Municipality

São Paulo, solar water heating mandatory in large residences after 2010 [this is not mentioned in the Legislative Proposal 276/06].


Date Implemented: 2006

Status: Mandatory by 2010

References: Legislative Proposal (Projeto de Lei) 276/2006, 28 April 2006

Brazil: Selective Incentive Programme for Solar Water heating in Sao Paulo Municipality

São Paulo, solar water heating mandatory in large residences after 2010 [this is not mentioned in the Legislative Proposal 276/06].


Date Implemented: 2006

Status: Mandatory by 2010

References: Legislative Proposal (Projeto de Lei) 276/2006, 28 April 2006

Brazil: Selective Incentive Programme for Solar Water heating in Sao Paulo Municipality

São Paulo, solar water heating mandatory in large residences after 2010 [this is not mentioned in the Legislative Proposal 276/06].


Date Implemented: 2006

Status: Mandatory by 2010

References: Legislative Proposal (Projeto de Lei) 276/2006, 28 April 2006

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Rural Electricity Supply Technology (REST) Mission

Providing affordable and reliable power supply to rural and remote areas through decentralized distributed generation based on renewable energy resources such as solar, mini-and micro-hydro, biomass, etc.


Status: In Force; Government Initiative

Targets: “Power for all villages by 2007” and ” Power for all” by 2012

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: Demonstration and Promotion of Solar Photovoltaic Devices and Systems in Urban Areas

The scheme provides financial support for installation and demonstration of various solar photovoltaic devices and systems for community application and for organizing seminars, workshops, and training programmes to create awareness about the systems in urban areas.



Date Implemented: 2005

Status: In Force; Voluntary

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: New Technology Group

The Group focuses on the application of renewable energy technologies to mitigate the energy problems of cities, and to provide alternative energy solutions. This is envisaged broadly through the programmes on Solar thermal and photovoltaic devices and systems, energy recovery from urban, industrial and commercial wastes and Biomass energy and co-generation in industry. Revised/new schemes were developed by the Ministry covering the above programmes, and notified in July/August, 2005.   

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Research, Design and Development of Solar Thermal Technologies

The Programme includes RD&D projects, Test Centres for solar thermal devices/systems, and other activities related to resource assessment, capacity building through seminars, symposia and round-tables, etc.


Date Implemented: 2006

Status: In Force; Voluntary

References: http://mnes.nic.in/pdf/aa-stt-2006-07.pdf

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

India: Scheme on “Accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors” 

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Program to Improve the Air Quality in the Mexico City Metropolitan Area (PROAIRE)

Includes more than 80 measures that affect transportation, industry, the service sector, natural resources, health, and education. It focuses on the reduction of ozone and particulate matter, and emphasizes environmental education and citizen participation.


Date Implemented: 2002-2010

Status: In Force; Government Initiative

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Mexico Renewable Energy Program

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Official Mexican Norms (NOM) to determine the thermal performance and functionality of solar heaters

Programme to promote the sale of solar powered water heaters in the Mexican Residential Sector, demonstrate that is a viable and pollution-reducing option for heating water in Mexican households.


Date Implemented: 2002

Status: Government Initiative

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Initiative of Law for the Use of Renewable Sources of Energy (LAFRE)

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Official Mexican Norms (NOM) for solar heaters

NOM for solar heaters, with the goal of setting up criteria for the use of solar energy in new establishments and remodeling in Mexico City, that require hot water for productive uses. This NOM establishes that at least 30% of the annual energy consumption needs to come from solar heating systems.


Date Implemented: 2002

Status: In Force

References:

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Mexico: Sectorial Program of Energy 2001-2006 (PSE)

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Renewable Energy Supply Systems (RESS)

To supply electric current to community in the remote areas in Nusa Tenggara Timur (NTT), this project installed 175 units of Solar Home Systems (SHS), 3 Micro Hydro Power Plants, and 2 Hybrid Systems. In operation since October 1998, handed over to Gov’t of Indonesia in March 2001.


Date Implemented: 1997-2000

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Eastern Indonesia Hybrid Energy Project

Advanced Energy Systems of Western Australia in conjunction with Indonesian company PT LEN Industries has been chosen to design, install and monitor the performance of solar/diesel hybrid power system in 14 villages in South Sulawesi.


Date Implemented: 2001

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Renewable Energy Training/Demonstration Project - Kemiri, Irian Jaya (Papua)

Installation of renewable energy based electricity systems (SHS, Mini Hydro, Hybrid System), reducing emissions by 64 t CO2/year


Date Implemented: Formal timeframe for project: 1997 - 1998 but monitoring to extend through Dec 2000

Status: Ended; Government Initiative

Funding Information: Cost: US$ 234,000

Indonesia: Solar Home System Project

Indonesia: Solar Home System Project

Indonesia: Solar Home System Project

Indonesia: Solar Home System Project

Indonesia: Solar Home System Project

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

Indonesia: Presidential Regulation No.5/2006 on National Energy Policy (January, 2006)

Promoting utilization of renewable source of energy: biofuels, solar energy, wind energy, ocean wave and current energy, geothermal etc. Promoting energy efficiency and conservation and optimalization on energy production.Reduction of subsidy on fuel price. Reduction of energy elasticity.


Date Implemented: 2006

Status: In Force; Framework Policy

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: National Electrification Programme

Under this policy, the government is encorporating electrification and energy into its development programs.  Photovoltaic-based solar home systems have been integrated into the National Electrification Programme to provide a basic energy source to those households that cannot be grid-connected within acceptable cost parameters.


Date Implemented: 1994-2001

Status: Government Initiative

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: White Paper on Renewable Energy

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

South Africa: International Action Programme (IAP) Cape Town

To introduce a stated target of renewable energy sources in the energy mix of Cape Town, thereby moving towards a greater mix of cleaner and more efficient energy forms. The City hopes to finalise these targets within its Integrated Development Plan (IDP), which is the legislative long-term planning document, as well as to finalise these targets in the Cape Town Energy Strategy.


Status: Voluntary

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Iran: International Action Programme (IAP), Developing National Renewable Energy Masterplan

Development of renewable energy utilisation and related technology improvements. This master plan will be coordinated with other national development programmes, such as Five-Year-Development-Plans.


Date Implemented: 2004-2010

Status: In Force; Framework Policy

Argentina: Resolución 113/2001 Energía Eléctrica

This policy grants a tax deferment to power stations that use Solar or Wind generation for capacity installation or expansion.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

Argentina: Resolución 113/2001 Energía Eléctrica

This policy grants a tax deferment to power stations that use Solar or Wind generation for capacity installation or expansion.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

Argentina: Resolución 113/2001 Energía Eléctrica

This policy grants a tax deferment to power stations that use Solar or Wind generation for capacity installation or expansion.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

Argentina: Resolución 113/2001 Energía Eléctrica

This policy grants a tax deferment to power stations that use Solar or Wind generation for capacity installation or expansion.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

Argentina: Resolución 113/2001 Energía Eléctrica

This policy grants a tax deferment to power stations that use Solar or Wind generation for capacity installation or expansion.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

Argentina: Programa Nacional de Energias y Combustibles Alternativos y Sustentables

To help financing for the development of alternative and sustainable fuels.


Date Implemented: 2001

Status: In Force; Voluntary

References: http://www.farn.org.ar/bd/ecolegis/tc/2822.html

 

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Renewable Energy Law

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Township Electrification Program

The Township Electrification Program gave one million rural people in one thousand townships (or about 250,000 households) access to electricity with energy from solar PV, small hydro and a small amount of wind generation. The next phase of the program is the village electrification phase, aiming to electrify 20,000 villages during the period 2005-2010.


Date Implemented: 2001, installation completed 2003

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Program on New and Renewable Energy Development in China (1996-2010)

This program provides tax incentives and  low interest loans for new and renewable energy projects. 


Date Implemented: 1996-2010

Status: In Force; Mandatory

China: Sunlight Program

To upgrade the country’s manufacturing capacity of polycrystalline and other advanced silicon technologies; to establish large scale PV and PV/hybrid village power demonstration systems, home-PV projects for remote areas; and to initiate grid-connected PV projects.


Date Implemented: until 2010

Status: In force

References: China New Energy: Policy and Plan

China: Sunlight Program

To upgrade the country’s manufacturing capacity of polycrystalline and other advanced silicon technologies; to establish large scale PV and PV/hybrid village power demonstration systems, home-PV projects for remote areas; and to initiate grid-connected PV projects.


Date Implemented: until 2010

Status: In force

References: China New Energy: Policy and Plan

China: Sunlight Program

To upgrade the country’s manufacturing capacity of polycrystalline and other advanced silicon technologies; to establish large scale PV and PV/hybrid village power demonstration systems, home-PV projects for remote areas; and to initiate grid-connected PV projects.


Date Implemented: until 2010

Status: In force

References: China New Energy: Policy and Plan

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Electric Power Law

This law emphasizes government support of small hydropower systems, solar energy, wind, geothermal, biomass, and other renewable energy resources for rural electrification.


Date Implemented: 1995

Status: Framework Policy

References: Energy and Power in China: Domestic Regulation and Foreign Policy, The Foreign Policy Centre, http://fpc.org.uk/fsblob/448.pdf

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Import Duties

The Chinese government has lowered import duties to directly promote the development of renewable energy technologies.  The average import duty now stands at 23%, but renewable energy technologies enjoy special low rates: 3% for components of wind power plants, 6% for wind turbines, and 12% for photovoltaics (PV) systems.


Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Low interest loans

The Chinese government has issued low interest loans and interest subsidies for power plants using renewable technolgies to reduce the cost.


Date Implemented: since 1987

Status: In Force

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Brightness Program

Decentralized electrification of rural areas through renewables


Date Implemented: 1996-1999

Targets: Wind and solar equipment is to be installed to provide 100W of electricity per capita to eight million people, as part of the Central Government Poverty Alleviation Meeting.

References: http://www.nrel.gov/docs/fy04osti/35787.pdf

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: Medium and Long-Term Energy Development Plan Outline (2004-2020)

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

China: National Energy Strategy

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: Energy Efficiency and Renewable Energy (Ninth Malaysia Plan 2006-2010)

The Ninth Plan strengthens the initiatives for energy efficiency and renewable energy put forth in the Eighth Malaysia Plan that focused on better utilisation of energy resources. An emphasis to further reduce the dependency on petroleum provides for more efforts to integrate alternative fuels.


Date Implemented: 2006-2010

Status: In Force; Framework Policy

 

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Malaysia: MBIPV Project

The Malaysia Building Integrated Photovoltaic Technology Application (MBIPV) project promotes increased use of photovoltaic (PV) technology to tap solar energy and generate electricity for buildings. The project is expected to increase Malaysia’s installed BIPV capacity by about 330% (2MWp by 2010), and to lower the technology unit cost by some 20% than at present.


Date Implemented: 2005-2010

Status: In Force; Voluntary

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Pakistan: Renewable Energy Initiatives

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: The Philippines Energy Plan (PEP)

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Philippines: International Action Programme (IAP), Doubling the Generating Capacity from Renewable Energy Sources by 2013

To increase renewable energy-based capacity by 100% by 2013, increase efficiency and substantially contribute to the protection of the environment and contribute to the economic growth of the countryside through rural electrification.


Date Implemented: 2003-2013

Status: Voluntary

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Thailand’s National Energy Policy and Development Plan

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Thailand: Strategic Plan for Renewable Energy Development

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Malaysia: Energy Policy in the 8th Malaysia Plan/Five Fuel Policy

Nigeria: National Energy Policy

The National Energy Policy establishes guidelines for the protection of the environment in the exploitation of Nigeria’s fossil fuels.  It also emphasizes the exploration of renewable and alternative energy sources, primarily solar, wind and biomass.


References: http://www.un.org/esa/agenda21/natlinfo/countr/nigeria/inst.htm

Nigeria: National Energy Policy

The National Energy Policy establishes guidelines for the protection of the environment in the exploitation of Nigeria’s fossil fuels.  It also emphasizes the exploration of renewable and alternative energy sources, primarily solar, wind and biomass.


References: http://www.un.org/esa/agenda21/natlinfo/countr/nigeria/inst.htm

Nigeria: National Energy Policy

The National Energy Policy establishes guidelines for the protection of the environment in the exploitation of Nigeria’s fossil fuels.  It also emphasizes the exploration of renewable and alternative energy sources, primarily solar, wind and biomass.


References: http://www.un.org/esa/agenda21/natlinfo/countr/nigeria/inst.htm

Nigeria: National Energy Policy

The National Energy Policy establishes guidelines for the protection of the environment in the exploitation of Nigeria’s fossil fuels.  It also emphasizes the exploration of renewable and alternative energy sources, primarily solar, wind and biomass.


References: http://www.un.org/esa/agenda21/natlinfo/countr/nigeria/inst.htm

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Conservation Strategy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Pakistan: National Environmental Policy

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Philippine Energy Plan

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Executive Order 462

This executive order provides incentives and support for the exploration and development of ocean, solar and wind energy resources for power generation.


 

Status: In Force; Voluntary

References: “New and Renewable Energy Resource Development;” Country Analysis Brief: Philippines

 

Philippines: Investment Priorities Plan (IPP)

This plan outlines the sectors in which the Filipino government is actively promoting investment with incentives and a favorable regulatory framework. Activities promoted include the development of alternative energy sources and natural gas resources, as well as, for example, manufacturing items for export and building housing developments.


 

Date Implemented: 2004

Status: In Force; Voluntary

Philippines: Investment Priorities Plan (IPP)

This plan outlines the sectors in which the Filipino government is actively promoting investment with incentives and a favorable regulatory framework. Activities promoted include the development of alternative energy sources and natural gas resources, as well as, for example, manufacturing items for export and building housing developments.


 

Date Implemented: 2004

Status: In Force; Voluntary

Philippines: Investment Priorities Plan (IPP)

This plan outlines the sectors in which the Filipino government is actively promoting investment with incentives and a favorable regulatory framework. Activities promoted include the development of alternative energy sources and natural gas resources, as well as, for example, manufacturing items for export and building housing developments.


 

Date Implemented: 2004

Status: In Force; Voluntary